Skip to main content
Standards
5 min

Accuracy Classes and Intended Use

May 2, 2026

Reality capture makes it easy to produce a number. It does not automatically make that number defensible. What makes a measurement usable downstream is the pair of statements attached to it: how it was derived, and what decision it was produced to support.

An accuracy band communicates the realistic tolerance achieved under the actual capture conditions — control, geometry, weather, surface. It is stated after processing, not promised in a proposal.

An intended-use statement is narrower than people expect. A measured roof area produced to support a repair bid is not automatically appropriate for a certified area determination. Saying so on the deliverable protects everyone.

When both statements are present, a qualified professional can decide whether the evidence fits their scope of work. When they are absent, the professional has to re-derive the data anyway.

Professional boundaries

  • Legal boundary and property line determinations require a licensed land surveyor.
  • Final tax positions, asset lives and depreciation treatment require a qualified tax professional.
  • Structural, mechanical and other engineering conclusions require a licensed engineer.
  • Official valuations and appraisals require a licensed appraiser.
  • Thermal imagery indicates apparent anomalies only and is not a diagnosis.
  • Legal opinions, causation findings and expert testimony require qualified counsel and retained experts.

Next step

Start with the decision you need to make.

Tell us the property and the decision. You get a written scope with an exact price before anything is scheduled.